The footpath diversion is in place - 25th Feb 2005
|
Installation of Traffic Management - 28th Feb 2005
|
Removing the old road surface - 1st March 2005
The road surface being removed prior to excavating the footings
for the west half of the new bridge. These will go down to the remains of
the massive foundations of the 1924 concrete bridge.
|
Removing the old road surface - 1st March 2005
|
Excavating into infill - 4th March 2005
|
Excavating into infill - 4th March 2005
|
South west abutment exposed - 7th March 2005
The 1924 mass concrete was
found to be quite badly cracked due to the demolition work in 1970
.
Extensive remains of the towpath ramp retaining wall
were also found quite close to the surface.
|
1924 south abutment exposed - 7th March 2005
|
Notice board providing information for the public visiting
or passing the site
|
The base for the formwork being prepared 15th March 2005
|
The wildlife coming to have a look
|
The formwork to support the concrete for the west side
of bridge 19th March 2005
|
The formwork to support the concrete for the west side
of bridge 19th March 2005
|
Formwork
in position 24th March 2005
|
Formwork
in position 24th March 2005
|
|
|
What we were aiming at.......
|